Annual maintenance and new bridge in Asheville NC

Asheville, North Carolina
September 2026

It was time for the annual Trail maintenance and we added a 12 foot long and 6 foot wide UTV bridge. This bridge will be the connector for the next phase of trails that will go to the top of the mountain.