Hiking trail on Becky Mountain
Brevard, North Carolina - 2026-08-11
This amazing hiking trail has over 125 steps that make tackling the steeper grades easy. Access to the stream at two different sections of the trail lets you emerge yourself in the cool mountain stream water as you navigate around the property.
Charolette Latin School
Charolette, North Carolina - 2026-08-05
Charolette Latin School has an amazing running program. We have worked on these trails periodically over the past 15 years. Recent construction required some reroutes on this spectacular course. Gravel topped with stone screenings compacted makes for a fast yet soft surface. Good luck to the CC team this year!
High Falls trail repairs
Cashiers, North Carolina - 2026-08-05
Rail repair, new rock steps , removing large roots and trail trim work on High Falls trail. This 1.5 mile out and back trail is rugged but the waterfall at the bottom is amazing!
Trail design in Cedar Mountain, N.C.
Cedar mountain, North Carolina - 2026-07-28
3/4 mile hiking trail design on private property. These trail are broken down into 3 segments. Each segment has a different feel as the trail weaves around the property. These trail will be built around the current UTV trails already in place.
MTB Trail in Asheville, N.C.
Asheville, North Carolina - 2026-07-15
1/2 mile design of MTB trail in Asheville, N.C. This trail will have berms and rock gardens. Short, but sweet and just out the back door!
Bracken Preserve phase 4
Brevard, North Carolina - 2026-07-08
The Bracken Preserve’s new trail system adds nearly two miles, marking the culmination of a project more than five years in the making. Long Cane Trails was first approached by the City of Brevard in 2021 to redesign the steep section beyond the parking lot. As planning progressed, Conserving Carolinas joined the effort, purchasing additional property that allowed the city to expand the system around Waterford Place. Following years of planning and land acquisition, I worked closely with Howard Granat with the Parks and Recreation Department to develop the vision for this new two-mile system. Once the design was finalized, the community, individual donors, and partner organizations stepped up to secure the necessary funding. After a competitive bidding process by 2 other Professional Trail-builders, the City of Brevard awarded Long Cane Trails the construction contract. While there were initial discussions regarding berms and single track sections for the mountain bike trail, we chose a design and build that serves the broader community. Recognizing that the majority of Bracken Preserve visitors are hikers, runners, and families, our mission was to create a trail that is welcoming for walkers while remaining engaging for beginner and intermediate mountain bikers. The project was completed using a hybrid construction model. Long Cane Trails managed the professional machine work and technical construction, while Pisgah Area SORBA led an incredible volunteer effort. Volunteers cleared debris, removed roots, and performed finishing work , allowing our team to focus on crafting sustainable, high-quality trails. This hybrid approach also proved highly cost-effective. With over $15,000 in volunteer labor and approximately $35,000 in design/ build donations from Long Cane Trails, the City of Brevard saved over $50,000. It is inspiring to see what a community can achieve through a shared vision. Thank you to the City of Brevard, Conserving Carolinas, Howard Granate, Pisgah Area SORBA, and all the donors and volunteers who made this possible.  
Private Hiking trail in Asheville, N.C.
Asheville, North Carolina - 2026-07-04
1/2 mile hiking trail on private property in Asheville, N.C. This trail connects a new cottage to a lower road where the owners can continue back to their new home.
Valley Bear Farms signage
Balsam grove, North Carolina - 2026-06-17
Signage is an important component of any trail system. Markers keep you on path which gives you a sense of confidence as you travel the Trail. Emergency markers help you to know exactly where you’re at on the trail . Trailhead signs let you know what trail you’re on as well as the rating of this trail. #valleybearfarms just got a complete signage system on their trails- go check it out!
Hand built in Cedar Mountain, N.C.
Cedar Mountain, North Carolina - 2026-06-03
Hand built trails have their place. This unique landscape had lots of water moving through it so low impact dirt moving was necessary. Turns in the trail, undulating the trail and steps weave through the forest after the perfect location of the trail was placed. A hand built trail really allows you to get more intimate with nature.
Zen Garden Phase 4
Brevard, North Carolina - 2026-06-01
Zen Garden phase 4 involved 54 rock steps from a garden area to connect to the newly created bench in phase 3. This trail wraps between large boulders and under rhododendron trees. Handrails were installed for a positive grip going up and down the trail.
1.5 miles of flow trail on Johns Island, S.C.
John’s island, South Carolina - 2026-05-06
1.5 miles of flow trail through the palmetto trees. Using rock in places to harden the trail surface this trail brings the rollers to lower S.C. This area has trails but none built with flow. Built on private property for kids that have found themselves with Mountain Biking.
High Hickory Assessment
Swannanoa, North Carolina - 2026-05-01
6 mile trail assessment on the High Hickory trail system. These trails were completed 6 years ago and needed some repairs after Helene. Prescription included some tread work, steps, trees to cut out and lots of brush work. Trails are ever changing as the nature and weather shapes its surroundings. Trail Maintenance is an essential component of any trail system.
Lake toxaway masterplan addition
Lake toxaway, North Carolina - 2026-04-23
1 more mile of trail to hidden waterfall added to master plan at Lake Toxaway private estate.
Dusty Ridge Trail design
Taylorsville, North Carolina - 2026-04-22
1 mile design at Dusty Ridge Park. This trail will be open to hikers and possibly bikers. The trail connects 2 ball fields and will provide more recreational opportunities for this community. #longcanetrails #ptbamember #protrailbuilder #traildesign #alexandercountync
Falling Creek phase 10
Tuxedo, North Carolina - 2026-04-16
Phase 10 at Falling Creek Camp brought a new skills course and some berms to the old trails. This skills course was built for beginner riders to practice some MTB moves before they hit the trails. The educational component of these features are important for kids to build confidence.
Valley Bear Farms phase 2
Balsam grove, North Carolina - 2026-04-16
#valleybearfarms phase 2 complete. This adds 3 miles to the system now making 6 miles of trail! The new Yellow trail highlights the rocky areas of the property and serves as the only difficult trail on the property. From trails, disc golf, garden, pond and steam room- this place has it all. The accommodations are off the chart! Trails are open to bikes and hiking. Go check out one of the best glamping spots in WNC!
Cross Country running course for School
Waxhaw, North Carolina - 2026-04-10
1.5 mile running cross country loop designed for a private school just outside the Charolette area. This loop will concentrate on a smooth surface and root free trail system. Minimal elevation grades with a 5 foot wide trail will allow runners to clock their best times on this outdoor track.
Spring trail tune up
Brevard, North Carolina - 2026-04-02
Spring trail tune up on some older trails we built a few years ago. Every trail needs some special attention from time to time. This 2.5 mile trail system had a few danger trees overhanging and across the trail. Leaves and some exposed roots were removed. Now this private trail system will be enjoyable for the rest of the year. #protrailbuilder #longcanetrails #brevardnc #ptbamember #privatetrails #springtrailcleanup
Hiking trail design in Brevard, N.C.
Brevard, North Carolina - 2026-04-01
Almost a mile of newly designed hiking trail on steep slopes. Off the main loop are 3 side trails. Two take you to the stream and one will take you to a lookout platform overlooking the waterfall. This trail building project will have lots of switchbacks and some steps but the overall grade is still 7%. #longcanetrails #protrailbuilder #brevardnc #ptbamember #transylvaniacountync #privatetrails #waterfalltrails
Garden path in Clyde, N.C.
Clyde, North Carolina - 2026-03-18
1/3 mile garden trail. The trail was designed and built for the owner to access the steeper terrain to plant gardens and a variety of plants along the trail side. The trail will serve as a walking path and access to the plants and gardens for maintenance . The trail was split into two sections of the property. Locust stairs to lessen the grade in sections and 4 benches were added along side the trail. Can’t wait to see this trail next Spring!
Garden hiking trail in Clyde, NC
Clyde, North Carolina - 2026-02-04
1/2 mile trail designed on private property. This trail was designed to navigate the gardens that will be planted around the house.
Private hiking/ biking trail in Waynesville , N.C.
Waynesville, North Carolina - 2026-02-02
Just under a mile of hiking/ biking trail designed for private owner in Waynesville, N.C. Lots of lines through Hugh boulders. Another great adventure just out the back door!
15 foot bridge in Saluda, N.C.
Saluda, North Carolina - 2026-02-01
One last bridge at #pearsonsfalls . This 15 footer serves as a dry crossing for the small stream that feeds to the main creek. Opening again soon, go check it out!
Valley Bear Farms trails
Balsam groove, North Carolina - 2026-01-03
#Valleybearfarms is a special place. Nestled in a remote area between Brevard, N.C. and the Blue Ridge Parkway, this Luxury Glamping Resort offers 6 miles of trails! These are open to hiking and Mountain biking with your stay at this amazing place. More amenities include disc golf, Pickleball, Bocce Ball and a Sauna . Phase one was completed a while back and we are currently on phase 2. Currently there are 3 miles of trails. One leads to an amazing waterfall! Photos below. Check out this place-https://www.valleybearfarms.com  
Asheville private hiking/ biking trail network
Asheville, North Carolina - 2026-01-01
Almost 2 miles of new biking/ hiking trails on private property. This network has 4 loops that stack on top of themselves from the bottom to the top. This design offers many loop options. With almost 400 feet of elevation gain, options are nice!
Phase 2 Glen Cannon Falls
Brevard, North Carolina - 2025-12-24
Phase 2 will bring another lookout deck and new trails to the other side of the waterfall. This little network of trails is private and offers users almost a half mile total of trails to explore.
Pearson Falls
Saluda, North Carolina - 2025-12-03
9 months of work produced an amazing new path to #pearsonfalls. Hurricane Helene completely changed the route of the stream and overall landscape of this area. The new trail is engineered with minimal steps to.make the experience easier
UTV trail in Old Fort, N.C.
Old Fort, North Carolina - 2025-12-03
1/2 mile UTV trail designed on private property in Old Fort, N.C. With most of the acreage clear cut, we found the woods around the border and it all lined up for a great level 5 foot wide meandering journey around the property! The yellow trail gives the owner access to the lower field that was not previously accessible due to the steep slopes. This truly is an example of utilizing your property to its full potential.
1.5 mile MTB trail on Johns Island, S.C.
John’s Island, South Carolina - 2025-12-02
1.5 miles of MTB trail designed in Johns Island, S.C. on private property. Through the Spanish Moss we have weaved an amazing route that anchors to large Cypress trees and Cinnamon ferns. Overlooking marsh areas full of wildlife, this trail will be an amazing journey through the Low Countries terrain.
Switch back turn rebuild
Hendersonville, North Carolina - 2025-11-13
Switch back turn rebuild due to uprooted tree taking the entire corner out. Harvesting rock for the crib wall and dirt from the fallen trees rootball made for a rock solid turn!
Bike/ Hike trail in Asheville, N.C.
Asheville I, North Carolina - 2025-11-05
1.5 miles of new trail designed for hiking/ biking for Private owner in Asheville, N.C. This connection will allow owner access to a residential street that ends up at the office. Riding to and from work using the new trail system everyday is a great way to stay fit and reduce your footprint.
Waterfalls and trails on private property
Brevard, North Carolina - 2025-11-04
Phase 2 on this project was challenging but fulfilling to build. 2 new miles of hiking and UTV trails on private property. These trails traverse through lush forest next to a creek where you pop out next to a high waterfall. New trails on just purchased land makes the property that much better. 65 locust steps were needed on the steep sections of this trail system.
Private property design Asheville N.C.
Asheville, North Carolina - 2025-10-22
1.6 miles of new trail designed on private property. This stacked loop trail system connects the owners with another trail system on top of their property. Designed mostly for mountain bikes but hiking and ATV access also.
Marshall N.C. Trail clean up
Marshall, North Carolina - 2025-10-01
Fall clean up on 6 mile private trail system. Trees had fallen across trails and grass in areas grew to waist high. Tuned up and ready to go over the winter!
Zen Garden Phase 3
Brevard, North Carolina - 2025-10-01
Phase 3 at the Zen Garden. We love projects like these that let us show our landscaping skills while controlling water on the property. This phase also added a small trail that goes over a large rock where we placed a bench angled for sunsets. It’s very cool blending natural products to make art.
St. John in the Wilderness Church trails
Flat Rock, North Carolina - 2025-09-04
Good things take time. After one year we are very pleased with the outcome of the trail system at #stjohninthewildernesschurch .From natural surface trails to hardened gravel trails, this historic passage trail takes users back in time. Along the trail we made custom signage to highlight areas of interest. An outdoor classroom and backed benches were made by using wood from the grounds of the Church. The #pisgahmapcompany made a fantastic map to help users navigating the trails. These trails are open to the public for biking and hiking. Total length is just over 1 mile.
Private MTB flow trail
Iron station, North Carolina - 2025-09-01
1.5 mile backyard flow trail. Lots of berms and jumps on 4 trails that start out of the front door and end at the bottom of the property near a creek. A graveled road will be used to get back to the top of the 4 downhill runs. Each trail is a bit different with one trail using an old ditch like a skateboard half pipe as it travels downhill.
Phase 1 Brevard NC private hiking trails/ UTV trails
Brevard, North Carolina - 2025-08-08
Phase one on private property was about a 1/2 mile total with a hiking trail and UTV trail. The UTV trail was built where the future driveway would go. This leads to the future house site. From there the hiking trail drops off through small streams, near waterfalls and the headwaters of a creek. So cool to see the trails go in before the house!
Copper Ridge Trail Old Fort, N.C.
Old fort, North Carolina - 2025-08-07
Reroute on Copper Ridge trail. This is part of the Fonta Flora trail also. Helene damage was patched but needed a new section of trail for a permanent fix. The goal was to take a well know trail and add this section in with seamless transitions as Mountain Bikes carry lots of speed through this section. Mission complete!
Asheville private trail phase 2
Asheville, North Carolina - 2025-08-06
1/2 mile new hiking/ biking trail on private property. Only 10 minutes from downtown Asheville, this trail system circles the future homesite . Designed to be ridden right out the garage door! Sections of the trail parallel a stream while other sections go through dense hardwood areas.
Summer trail clean up on Private Property
Asheville, North Carolina - 2025-08-01
Summer can be a burden for a trail owner. Some areas get overgrown and trees fall across the trails. These particular trails seem to need maintaining about every 2 years This clean up was on trails built 4 years ago.
Bamboo trail phase 3
Brevard, North Carolina - 2025-07-10
Phase 3 on backyard trail in Brevard, NC. This completes the loop in the backyard that goes over a few storm wash areas where the boardwalks were installed. Surrounded by bamboo, this trail feels like your walking through a jungle!
Trail clean up in S.C.
Table rock, South Carolina - 2025-07-10
High winds can be a trail owners worst nightmare. 10 trees fell across the trail we built 4 years ago. The owner was not able to get the 10 trees out to enjoy the trail so we helped.
Hybrid trail build on Private Property
Brevard, North Carolina - 2025-06-05
Half mile Hybrid build done in June of 2024. We waited to post this project to show how hybrid projects finally look like. This is when we do the heavy lifting and the customer does the small touches and landscaping on the trail. The idea is to work with the customer to educate them on the techniques of building / maintaining a trail as well as meeting budget constraints. After one year you can see the trail has become more narrow from the ferns. This was designed as a walk/ bike trail. We love being able to work with our customers in this way!
2 miles of new trail on private property
Brevard, North Carolina - 2025-06-04
Just over 2 miles of hiking trail on Private Property. What a great place for the kids to grow up under the trees- in your back yard! Some of the trails are next to streams and the forest is loaded with different ferns and plant life. This trail system allows users to hike through different areas of Transylvania County’s Temperate Rainforest.
Hiking Trial design in Boone, N.C.
Boone, North Carolina - 2025-06-04
1/8 mile nature trail designed in Boone, N.C. This trail will offer garden areas, reflection space as well as a butterfly and honey bee area. Surrounded by Rhododendron and blooming flowers already, this trail will be magical!
2 mile hiking trail design
Brevard, North Carolina - 2025-05-15
Can’t wait to build trails to these private waterfalls! 2 miles of new trail on the way!
1/4 hiking trail private property
Asheville, North Carolina - 2025-05-08
1/4 mile hiking trail on private property. Crossing a stream a couple times allows the trail to parallel the water for a section. Trail construction and landscaping at its best!
Private Property – clean up
Brevard, North Carolina - 2025-04-17
Helene cleanup continues. This project focused on cutting out trees across the trail, washed out stream crossings and some tread work. The trail building material for the wet crossings were harvested from the property. Our smallest excavator was needed to navigate this 2 foot wide path- we could have given at trail building workshop on proper excavator operation on this job! It was nice to bring the trail system back to this private property.
Private property- design
Iron station, North Carolina - 2025-04-02
1.1miles of flow downhill trails on private property. 4 downhill runs end in one place where an old road will take you back to the top. Jumps, berms, tabletops and rollers will be placed on each trail.
Private Property
Marshal, North Carolina - 2025-03-05
Phase 3 completes another 2.5 miles for a total of 6.2 miles of hiking and MTB trails! Phase 3 negotiated large boulders to craft the path along the French Broad River. With 1600’ elevation change between the low point and high point. This trail system takes you through many different forested areas. This sustainable trail design and build took us to the edge a few times but good planning goes a long way.
Private property Rosman N.C.
Rosman, North Carolina - 2025-03-01
2 miles of hiking trails designed in Brevard N.C. Trail building plans include a few stream crossings and multiple different trail loop options. Connecting just out the back door of the house, this family will be on the trails daily.
Private Property- Helene Clean up
Mills River, North Carolina - 2025-02-06
Storm clean up after Hurricane Helene. Lots of tree root balls across trail. Tread was in need of repair in places also. We added a jump over a downed tree for the owner to have an optional boost on the trail!
Private property hiking trail
Brevard, North Carolina - 2025-02-01
1/8 mile zen hiking trail -phase 2. This nature park is located on a private residence and takes advantage of the surrounding natural features that we were able to use as trail building features. This was a very fun project for our crew also as we got to engage some new trail building techniques on some of the benches.
Private Property- hiking trails
Tryon, North Carolina - 2025-01-08
Lovely 3/4 mile hiking trail in Tryon, N.C. Circling the house this trail also drops to another recreation area where concerts, and other events take place. The trail snakes under an amazing rock foundation that serves as a parking area for the home. A few steps throughout the trail makes the hike an easy stroll in the woods.
Foothills Trail
Sapphire, North Carolina - 2025-01-02
The Foothills Trail is from S.C. Thru N.C. and finally ending at Oconee State Park in GA. Covering 77 miles and many mountains, this trail is a legendary hiking passage. We assessed 42 miles of the trail for Duke Energy that currently manages the land and entire trail system. This work was done to access the condition of the trail system. Not much will change for the public but there is a new virtual locator app for the entire length of the trail!
Private Property – Design
Lake Toxaway, North Carolina - 2025-01-01
4.75 miles designed on this amazing private property that has waterfalls everywhere! All the trails were designed for UTVs with short hiking trails to the Falls and overlooks. The trail system will allow access around this wonderful property through areas that can not be built on but great for trails. Being designed within a Conservation Easement assures these trails will be around a long  time.
Bracken Preserve – Upgrade Maintenance
Brevard, North Carolina - 2024-12-01
Bracken Preserve got a small upgrade at the trailhead. The locust lasted 13 years but the rock will last forever! There is a before picture added below for comparison.
Private Property – Clean Up from Helene
Saluda, North Carolina - 2024-11-01
Fixing pulled up roots balls on the trail, clearing lots of down trees and clearing leaves off a trail we built about a year ago. Hurricane Helene's wind gust hit this area hard.
Private Property – Helene Clean-Up
Hendersonville, North Carolina - 2024-11-01
Hurricane Helene clean up on approximately 10 miles of trail. This private property offers such a variety of terrain and is one of my favorite places to ride. From rhododendron to large pine and oak forest then into stunning open fields.
Private Property – Phases I & II
Marshall, North Carolina - 2024-11-01
4 miles of amazing MTB trail completes phases 1 and 2. We have been working on this project since spring. Such a variety of terrain this trail system travels through on its way around the borders of this extensive property along the French Broad River. Two more miles in phase 3 are in the works!
Stumpy Creek Park
Mooresville, North Carolina - 2024-11-01
3/4 mile new hiking/biking trail a Stumpy Creek Park in Mooresville, NC. Now open! This trail heads directly out of the main parking lot and takes you immediately into a thick pine forest. With little elevation change, this trail is great for families, kids, or pet walks.
Private Property – Design Phase
Tryon, North Carolina - 2024-10-01
1/2 mile design on Private estate in Tryon, NC. One trail loops the house while one spur goes to a flat area for a future fire ring or benches. Another spur trail connects to a local park. What a cool way to utilize the hilly terrain around your home!
Private Property – Design Phase
Travelers Rest, South Carolina - 2024-10-01
With a couple service roads already in place, we connected everything for a total of 2 miles of trail! These trails were designed and will be built for hikers that enjoy easy footing in rugged terrain. The system was designed to offer loops within a larger loop creating options for the users. The most amazing part of the trail system are the 3 types of Forest the trail’s meaner through. Upstate SC is a special place!
Private Property – Trail Repair
Henderson County, North Carolina - 2024-10-01
Landslide repair on existing trail system for private owner. This slide took out 1 turn and 70 feet of trail. Bridge was too expensive, so a reroute took care of the problem.
St John in the Wilderness – Design Phase
Flat Rock, North Carolina - 2024-10-01
1 mile mixed trail use design at St. John in the Wilderness. Half was designed as a flat wide graveled trail while the other half uses the private property for mountain biking and hiking trails! These trails also connect the local community to the church.
La Parc
Pisgah Forest, North Carolina - 2024-09-01
Pleasant walking path to waterfall in the old Glen Cannon neighborhood now called La Parc. Lots of locust steps make the stride easier on the steeper sections of the trail. There are two 12 x 8 foot decks with railing strategically placed for the ideal view of the waterfall. This trail is a great addition to the neighborhood trail system that already exists.
Sprout – Phase II
Fletcher, North Carolina - 2024-09-01
Phase 2 at Sprout Development. The total now is 4 miles of trail after this phase added 2 more miles to phase 1. What a great place to hike or hike right out the door!
Oak Hills Community Park
Morganton, North Carolina - 2024-08-01
Burke County just added 4 miles of biking/hiking trails in Oak Hills Community Park! Ribbon cutting is this Friday at 9:00am. Go check out this fresh new trail that offers a variety of different terrain.
Private Property
Brevard, North Carolina - 2024-08-01
1/2  mile UTV trail to stream. This trail needed to be 6 feet wide to accommodate the 4 seater taking trips deep into the forest using existing roads and this section of trail.
Private Property – Clean Up
Cashiers, North Carolina - 2024-08-01
Trail clean up on a 5 year old project. When we built this trail in 2018, we danced around large rocks. After 5 years, rocks on the tread from quarter size to cantaloupe sized littered the trail. Hiking on loose rocks can be tricky. This trail was brought back to life!
Private Property – Clean Up
Mills River, North Carolina - 2024-08-01
Clean up on private trail built a couple years ago. This 8/10 mile loop packs some tight twisty sections of trail with rock gardens and bermed turns.
Private Property
Sylva, North Carolina - 2024-07-01
1/4  mile hiking trail to beautiful flat area by stream. This trail cuts across steep slopes to make an 8% average grade making for an easy walk up or down.
Bracken Mountain Preserve – Phase III
Brevard, North Carolina - 2024-06-01
Great work completed using a talented group of volunteers. The entrance of Bracken Mountain Preserve trail starts a bit easier now. The washed out area was rock armored and the steeper sections of trail were rerouted. More work to come later this year!
Private Property – Design Phase
Sylva, North Carolina - 2024-06-01
1/4 mile hiking trail design from future house location to stream.
Brevard Elementary School
Brevard, North Carolina - 2024-05-01
Brevard Elementary School has a new 1/2 mile hiking/biking course on campus! We were able to use the wooded area behind the school to achieve this great loop. This trail is open to the public and dogs must be on a leash. Getting kids under trees on a trail is a great thing.
Elite Neighborhood in Asheville, NC
Asheville, North Carolina - 2024-05-01
1.2 miles of compacted gravel surface now makes a loop around this prior unused green space in an elite neighborhood in Asheville, NC. The trail has a few bridges and a stream running through the middle. Great addition to this neighborhood!
Falling Creek Camp for Boys – Phase IX
Tuxedo, North Carolina - 2024-05-01
Earlier this year we built a 1 mile connector trail from the Falling Creek Camp waterfall to the top of the ridge. Building through challenging rocky terrain made this trail a special one. With the many other trails on the campus, this was a major connection between 2 trail systems.
Private Property
Asheville, North Carolina - 2024-05-01
1 mile hiking trail done Hybrid style in Asheville NC. This customer had the desire and time to clear the trail for us after our design. This prepares the trail for the machines. Next we construct the trails using the machines. Finally the customer finishes the trail by cutting roots, shape some dirt areas and tidy up edges of trail. This is a cool way for the owner to get involved in the trail fabrication process to better understand the trail design and functionality.
Private Property – Phase II
Brevard, North Carolina - 2024-05-01
Phase 2 added another 1/4 mile hiking trail to the already 2.5 miles of trail we built in 2023. This connector brings the owner directly to the back porch!
Valdese Lakeside Park
Valdese, North Carolina - 2024-05-01
4 miles of new mountain biking and hiking trails are about to open at Valdese Lakeside Park!  With the efforts of the volunteers from Friends of Valdese Rec, together we cleared, built and finished the trails. This was a conglomeration between the 2 crews.  Two bridges and two skinny ride features were added.
Private Property – Design Phase
Asheville, North Carolina - 2024-04-01
This design was for a hiking and part UTV trail on private property in Asheville, NC. Green trail will be built for the UTV. This will contour the steep slopes for owner to access a flat spot on the property where a picnic area with UTV turnaround area will be placed. The Orange hiking trail connects to the neighbors yard for future trails! What a cool trail plan.
Jellystone Camp Resort – Phase I
Bostic, North Carolina - 2024-03-01
4 miles of new hiking trail at #jellystonecampground. If your a camper, glamper or have an RV-check this place out. It’s a full service resort with all the amenities. These hiking trails were designed to offer users many loop options. The Purple Trail takes you to an abandoned moonshine still. Trails are now open, go check it out!
Private Property – Design Phase
Asheville, North Carolina - 2024-02-01
1/2 mile hiking trail designed in Asheville, N.C. This trail will eventually lead down to a labyrinth.
Private Property – Design Phase
Asheville, North Carolina - 2024-02-01
3/4 mile hiking trail design in gated community in Asheville, N.C. Using the steep terrain to get from the far corner of the property to the side entrance of the basement, this trail takes you through rhododendron tunnels and open green spaces.
Duke Energy – Design Phase
Mooresville, North Carolina - 2024-01-01

3/4 mile walking trail design for Duke Energy Corporation. This trail will be bringing a chance to get under the trees near a local recreation park and neighborhood.

Duke Energy Corp – Design Phase
Catawba, North Carolina - 2024-01-01

1/4 mile hiking trail designed for Duke Energy Corporation. This trail will be used to access a river put in for small boats. Hikers can also enjoy a short walk to the river and along the stream.

Great Falls – Design Phase
Great Falls, South Carolina - 2023-12-01
Almost 7 miles of trail designed for SC Department of Parks and Recreation in Great Falls, SC. This new park is projected to open in 2026 giving users access to an island for many outdoor activities. Visiting historical sites, birdwatching and hiking will be the main activities on the island. With our recent work on Mountain Island just down the road, look for the town of Great Falls, SC to become a recreation destination in the future.
Private Property
Fairview, North Carolina - 2023-12-01
Almost a 1/2 mile hiking trail on private property. This trail was so cool! So many different forest systems on such a small trail system. This VRBO now has a great outdoor experience waiting just outside the door!
Private Property
Sylva, North Carolina - 2023-12-01
3/4 mile hiking trail on private residence. Nice hike on mini mountain beside home site. Just in time for a Christmas hike! The smell of the fresh cut wood, trees and dirt as one walks their new personal trail for the first time on their land is a moment they will never forget.
Private Property
Brevard, North Carolina - 2023-11-01
2.5 miles of private hiking trails in Brevard NC. Natural rock bridge with lots of rhododendron tunnels.
DuPont State Forest
Transylvania County, North Carolina - 2023-10-01
Two day rock armor training in DuPont State Forest. The lesson consisted of 2 techniques - Stone Pitching and a variation of Appalachian Armoring. The emphasis was on accommodating horses on a heavy use MTB trail. We worked on proper techniques that would keep horses from sliding on the rock we installed. It was important to also place rocks to avoid them from being pushed into the feet of the horses. With a super enthusiastic and passionate group we were able to armor to very troublesome spots in just 2 days!
Private Property
Saluda, North Carolina - 2023-10-01
4 miles of Private MTB/ UTV trails. The trail system circles the home and offers several smaller loop options to keep it fresh. These lucky owners now have a total of 5 plus miles of trail by using the old roads on the property and new trails!
Dupont Bike Retreat
Cedar Mountain, North Carolina - 2023-09-01
This course was build for one way fast MTB races. Next to stream, berms, short but stiff climbs and rhododendron tunnels-this course has it all!  Book a campsite and ride out your door.
Goose Creek
Goose Creek, South Carolina - 2023-09-01
3 day trail training with Environmental Conservation Corps at The Sustainability Institute. The training included using GPS tools to map trails and making bog bridges taller or longer. Great group to work with. We conquered an amazing amount of trail work while capturing GPS coordinates for possible future trail projects at the Wannamaker trail system in Goose Creek, SC.
Private Property – Design Phase
Asheville, North Carolina - 2023-09-01
1 mile hiking trail design in exclusive private neighborhood. This addition will give owners a chance to walk in the woods along a creek and out of the roads. Small Parking lot will be added as well as interpretive signage along the trail.
Tuxedo Falls – Phase I
Tuxedo, North Carolina - 2023-09-01
Tuxedo Falls, a 50-acre boutique lodging and land conservation project located in the North Carolina mountains now has 2 miles of hiking trails around the 2 creeks within the property! Numerous waterfalls and rhododendron tunnels.
Private Property – Design Phase
Sylva, North Carolina - 2023-08-21
Just over a half mile of hiking trail designed on private property. Great to be able to get in over a mile by walking the loop both ways just out your door!
Private Property – Clean Up
Asheville, North Carolina - 2023-08-01
Summer clean up on trails we built two years ago. 2.5 miles of cutting trees out, weed eating and repairing a bridge that a tree fell on.
Private Property
Hendersonville, North Carolina - 2023-07-01
1 mile hiking trail on private residence that had 22 locust steps added to make the hills even easier to navigate. We split the mile into 2 separate trails to offer route options. The trail opened opportunities for these owners to explore places that were too steep to navigate prior to the trail being built. What an amazing backyard trail system!
Great Falls – Phase II
Great Falls, South Carolina - 2023-06-01
These 2 miles of trail were some of the most challenging yet satisfying work that we have ever done. The logistics of working on an Island have been a practice of extreme focus. Open to the public July 2023. If you're a boater, don’t skip this place! The new access areas and blue runs are amazing!
Private Property – Phase I
Henderson County, North Carolina - 2023-06-01
3 miles of flowing MTB trails on private land. Phase 2 will yield  2 more miles. Lush ferns, tall Oaks, brown dirt, black dirt  and an array of different rocks to play with on this canvas!    
Private Property
Mills River, North Carolina - 2023-05-01
Just under 1 mile of  hike/MTB trail on private property. This was a hybrid project where the owner cleared the trail for the machines. We then built the trail. Finally the owner finishes the trail by cutting all the roots out of the tread, smoothing the tread out more, chainsawing any stumps that remain, run the pole saw and blower. The pictures you're seeing are ONLY machine work with no hand tools used.
Private Property – Design Phase
Transylvania County, North Carolina - 2023-05-01
2 miles of hiking trails split into two 1 mile loops on private property. This trail will pass under tall old growth trees and a few large rocks. With a setting atop the mountain, the views are amazing from the trail also. Half of the trails are along a stream!
Sasquatch Farm – Phase II
South Pittsburg, Tennessee - 2023-05-01
Just over 1 mile of hiking / UTV trail to one of the most amazing waterfalls we’ve seen. The water comes out of the ground yards before the falls and then goes back into the ground at the base of the falls. The water is going between the rocks! If you have an RV or want to camp, check this place out!
   
Haywood Community College – Phase III
Clyde, North Carolina - 2023-03-01
Phase 3 at Haywood Community College is complete! Almost 4 miles of trail now are wrapped within this beautiful campus and is open to the public.
Private Property – Planning Phase
Brevard, North Carolina - 2023-03-01
We are excited to start work on a 1 mile hiking trail on private property in May! This trail system offers two loop options with amazing views. Long Cane Trails loves getting people outside and connecting them to nature. No trail is too short to experience the great outdoors!
Jellystone Camp Resort – Design Phase
Golden Valley, North Carolina - 2023-02-01
Just over 4 miles of new trail will be added to this wonder camp resort! Jellystone Camp Resort is amazing and hidden within the southern mountains of Western North Carolina. These trails should be open to the public for hiking only by fall of 2023.
Private Property – Design Phase
Marshall, North Carolina - 2023-02-01
4.75 miles of hiking and UTV trail designed on steep terrain with lots of rocks. The build will be challenging but rewarding. Some of the trails take you from the top of the mountain to the river.
Private Property – Planning Phase
Brevard, North Carolina - 2023-02-01
Almost 4 miles of trail designed in Brevard! These trails will eventually be open to the public if you lodge with them. Amazing views and creeks along the route. The trails will be hiking and mountain bike friendly!
Tuxedo Falls – Design Phase
Tuxedo, North Carolina - 2023-02-01
Phase 1 will be 2 miles of hiking trails around some of the most gorgeous waterfalls. Tuxedo Falls will be a 50-acre boutique lodging and land conservation project located in the North Carolina mountains. We are excited to start building trails for this project in May!
Club Gap Trail maintenance
Brevard, North Carolina - 2023-01-03
An amazing workspace on Club Gap Trail in Pisgah National Forest. With some recent work done to repair power lines on U.S. Forest Service lands, parts of the trail was compromised by the machines used to repair the lines. Reworking the grade dips has brought this trail back to its best condition in years.
Private Property
Brevard, North Carolina - 2022-11-01
5 miles of mountain bike and hike trails on private property. Designed to be intermediate level at most and for kids.
Private Property – Phase II
Black Mountain, North Carolina - 2022-10-03
Phase 2 - 2.5 miles of UTV trails on private property near Black Mountain N.C. This brings this trail system to over 6 miles by using old roads and new trails connecting every corner of the property.
Great Falls – Mobilization
Great Falls, South Carolina - 2022-10-01
Let your dreams fly high! Transferring our equipment to Great Falls was an amazing experience.
Haywood Community College – Phase II
Clyde, North Carolina - 2022-09-01
Part of bringing a new trail system to Haywood Community College involved building new trails to connect old trails they already had. We always want to salvage any trail that’s existing if we can. In this case we had to close a user created short cut and erosion area to maintain use of the original trail. A drain and rolling grade dip at the top of the trail stopped all water from entering the trail to control  any erosion issues. The rock walls and native plant landscaping has deterred the users from short cutting the trail for good!
Private Property
Cedar Mountain, North Carolina - 2022-09-01
1/4 mile hand-built Singletrack trail. Anchored next to a small waterfall and stream.
Private Property
Brevard, North Carolina - 2022-09-01
Here is one in Brevard NC done in September on private property
1/8 mile trial through Zen water Garden. This place had several different types of moss that we were to protect and build trail through! Super fun hand build connecting property owner from the main house to the soon to be outdoor playhouse. The Peace within this pathway was incredible!
Private Property
Brevard, North Carolina - 2022-09-01
1/4 mile private hiking trail in Brevard N.C. This was a very Rocky and steep piece of land that we were able to negotiate around the large rocks to get to the bottom of the property.
Private Property
Charlotte, North Carolina - 2022-08-01
1/2 mile 5 foot wide compacted gravel walking trail. Connecting directly to all the courts and indoor pool, we are sure this trail will be used a lot!
Private Property
Rutherford, North Carolina - 2022-07-01
1 mile hiking/biking trail on private property. Bringing the trail to the edge of the grass in the backyard makes this trail literally out the back door! Backyard Trails for the family to enjoy and make memories on seems to be on the rise. We are proud to be a part of this!
Private Property
Waynesville, North Carolina - 2022-07-01
2 miles of amazing diverse hiking trail on Private Property in gated community. One side of the trail was a rocky build while the other side was like sculpting potting soil! This trail network even connects to a cave to hang out in. 134 rock or locust steps along the path make the footing easy on the steep mountain side the trail was constructed on.
Private Property
Cedar Mountain, North Carolina - 2022-07-01
2.5 miles of kid friendly MTB trails right from the door! Fun rolling terrain let us create a rollercoaster of a ride for these guys. The trail always seems to give you momentum and is a blast in both directions!
Private Property
Belmont, North Carolina - 2022-06-01
1 mile hiking trail on private property with a couple bridges. This property now is quite the adventures paradise with the house located on the lake with trails! This was another Hybrid project where the owner helps prep the trail for the machines and then helps to finish the trail. This technique teaches the client what it takes to build and later maintain the trail while helping get the trails overall cost closer to their desired level.
Private Property
Columbia, South Carolina - 2022-06-01
These lucky landowners now have 2 miles of  MTB Flow trail in their back yard! The parents and kids will make many memories on these trails. With the many drainages we crossed on this property it allowed for a pump track feel in sections. This trail is very easy at low speeds but can be demanding at high speeds.
Green River Preserve Camp
Hendersonville, North Carolina - 2022-05-03
1.5 miles of new MTB trail cornering  DuPont State Forest at Green River Preserve Camp. Mild grades up and down for the kids to enjoy this summer!
Private Property
Marshall, North Carolina - 2022-05-03
Private property hiking trail from house to French Broad River.  This was a technical design around rocks in steep terrain at times. We installed 32 steps to break the grade a bit as the trail approached the river. Total trail length was 1 mile with a 300 foot elevation drop from the house to the river. We love connecting owners to these beautiful areas on their property!
Private Property
Saluda, North Carolina - 2022-05-03
New 1/2 mile hiking trail to treehouse overlook. This hike is a great addition that allows guest to experience nature within minutes from their cabin!
Private Property
Brevard, North Carolina - 2022-05-03
Cool hybrid project with owners connecting little pieces of their initial trail. We tackled some of the steeper sections, with our machines, for the owner, as hand building those sections would have taken forever! A Hybrid Project is when the owner takes on half the responsibility of building the trail and we take on the other half. In this case, the owner cleared the trail for our machines. We then built the trail, and lastly, the owner finished the trail. This technique is unique in that it helps the owner achieve a price point they desire.
SEW-EURODRIVE Plant – Part II
Spartanburg, South Carolina - 2022-05-03
Our 8 month project comes to an end. What a cool project for a cutting edge company! A 2.5 mile trail system connects one facility to another. This includes 4 bridges and 3 boardwalks. 3 kiosk and two custom gates at major intersections. This 6 foot wide trail offers emergency access via UTV for the local fire department. The trail was intended for walking and biking during lunch hours for SEW Eurodrives employees. Studies show by engaging exercise during lunch hours, more production can be achieved. This model has been applied mostly in the Western part of the United States. SEW Eurodrive is ahead of their time by offering Healthy lifestyles options to their employees. Look for more of this in the future.
Great Falls – Phase I
Great Falls, South Carolina - 2022-04-01
1.35 mile design on some of the gnarliest terrain we’ve seen! Can’t wait to build this Portage trail for boats on a remote island in S.C.
Private Property – Phase II
Balsam Grove, North Carolina - 2022-04-01
Phase 2 design and build of kids MTB course on Private Land added another 1/2 mile of trail. It’s great joy building trails for kids!
Haywood Community College – Phase I
Clyde, North Carolina - 2022-03-01
Phase one at Haywood Community College is complete. We connected their current gravel trail system to make a loop. With a few connectors we created a 1/2 mile walking loop. Go check it out!
Private Property
Pisgah Forest, North Carolina - 2022-03-01
Short connector to current trail system in Private community. These trails are bike and hike friendly and designed for the easy to moderate fitness level user.
Private Property
Clyde, North Carolina - 2022-03-01
1 mile of new trail for upcoming glamping location in Western North Carolina. These trails are hovering around 4000’ with spectacular views. Look for the opening of this special place  in summer of 2022.
Private Property
Lake Lure, North Carolina - 2022-02-01
Short but steep trail with 54 locust steps to break the grade down to lake. Have a small trail project? We can make your dreams come true!
Private Property – Phase I
Balsam Grove, North Carolina - 2022-01-01
This 1 mile of hiking and beginner biking trail on private property will bring great pleasure to these young kids. What a Christmas present! This was phase 1. Phase 2 will have more berms and jump options.
Private Property – Phase II
Brevard, North Carolina - 2022-01-01
The taller the bamboo grows, the lower it bends~Japanese proverb Phase 2 of the backyard Zen Forest hiking trail complete. Saving the best for last!
Private Property
Cedar Mountain, North Carolina - 2021-11-01
1/2 mile hiking and biking trail on private property in Cedar Mountain NC. The hiking section uses locust steps and takes the owner beside a rumbling stream for a bit before reaching a flat 10 x 10 platform with a bench to rest. The MTB trail strolls through large boulders using gentle grades and a smooth surface.
Private Property – Phase I
Sapphire, North Carolina - 2021-11-01
Here is a design done in November. In sapphire NC private property
Cool new design on Sapphire Ski hill! A new hiking trail has been proposed for the summer months on the slope. Almost 1 mile of trail that goes in and out of the open slopes and tree covered areas.
Private Property – Phase II
Black Mountain, North Carolina - 2021-11-01
Phase 2 on this backyard hiking trail included 2 benches and lots of steps to make the footing perfect.
Private Property – Phase III
Sapphire, North Carolina - 2021-11-01
Phase 3 on this private property was exciting! Weaving in and out of the rocks in the design knowing that eventually we would have to hand build the top section. That only ended up being about 350 feet! The fall leaves were quickly covering up our work and the land started returning to its natural state.
Private Property
Clyde, North Carolina - 2021-10-01
Big views on this design at 4400’! 2 new miles of hiking trail on private property connecting to 3 miles of existing double track trails will make for some great high elevation loops!
Private Property
Black Mountain, North Carolina - 2021-10-01
Half mile hiking trail on private property in Black Mountain N.C. Easy grades through rhododendron tunnels makes this adventure even better!
Yogi Bear’s Jellystone Park Camp-Resort: Golden Valley
Bostic, North Carolina - 2021-10-01
We have just completed 3 miles of proposed hiking trail in the Yogi Bear’s Jellystone Park Camp-Resort: Golden Valley, NC.  Steeper grades are rewarded with breathtaking views, a cave and an old moonshine site!
Private Property – Phase I
Brevard, North Carolina - 2021-09-01
A few hundred feet through the majestic bamboo forest! Phase one on private property. When completed this trail will go around and in the bamboo forest-so cool!
SEW-EURODRIVE Plant – Part I
Spartanburg, South Carolina - 2021-08-09
New walking trails will be coming to the SEW-EURODRIVE plant in Spartanburg! Mainly for employees to exercise before, during or after work. There is a possibility these will become public also. 2.3 miles of trail designed around old tree growth, streams and wildlife.
Private Property
Black Mountain, North Carolina - 2021-08-03
 2.5 miles of new RTV and hiking trails on private property. This was amazing terrain to design and build trail on. Glad the rock cooperated with us and crumbled into smaller pieces!
Private Property – Phase II
Arden, North Carolina - 2021-08-03
Reworking jumps and drops for more progression. Kids learn so quickly and the need for more or bigger comes quick! Reshaping jumps on the trail will take these kids to the next level!
Private Property
Cedar Mountain, North Carolina - 2021-08-02
Awesome hiking trail complete on Private property in Cedar Mountain N.C. Just over 1/2 mile of trail . Using the rock within the tread to harden and then covering those rocks up with dirt until we had grade. There were a few rocks left over!
Private Property
Asheville, North Carolina - 2021-07-01
1 mile Cross Country bike and hiking trail complete on Private Property. Designed for the entire family to enjoy the woods! Cool rocks, trees and a few bridges-this trail has it all.  The best part is the Kids Mountain Bike Flow trail. The first loop is the easier lower section of a stacked loop Flow Trail System.
Private Property
Buffalo, South Carolina - 2021-07-01
3 miles pushed in with volunteers finishing the trail. They did a great job clearing it for the machines also! We LOVE hybrid trail projects with clients where they get involved with the process. This was a collaboration with the South Carolina Interscholastic Cycling League. Kids on bikes rock!
Private Property
Saluda, North Carolina - 2021-06-01
UTV trails reworked. New 8 foot wide bridge, drainage features added to old trails and gravel topped with decorative stone around pond trails.
Private Property
Connelly Springs, North Carolina - 2021-06-01
Need a small trail system on your property? This walking trail was less than 1000 feet long and took the owner from their house to the lake.
Bridgemore Village – Phase II
Thompson Station, Tennessee - 2021-05-01
Phase 2 complete with a total of 4 miles of new hiking trails in this Private development in Tennessee. We enjoyed all aspects of this project from design to finish! From puffing up low sections of terrain to desperately searching for dirt to fill in over the flat and long rocks of Tennessee.
Private Property – Phase I
Tryon, North Carolina - 2021-05-01
Phase 1 complete on a 1/2 mile of walking trail on private property in Tryon NC. 4 foot wide smooth walking trails under pine and poplar trees makes this an easy stroll through the once overgrown woods on steep slopes.
Private Property
Pickens, South Carolina - 2021-04-02
1.7 miles hiking and biking trail overlooking Table Rock State Park in Pickens S.C. Designed for the intermediate to beginner user. Mild grades and wider turns make for a great ride!
Private Property – Phase II
Sapphire, North Carolina - 2021-04-01
We enjoyed dancing through the rocks in Saphire N.C.! Phase 2 was another 1.5 miles to the summit of the mountain. We are digging the rhododendron cleared from the  woods, but would not want that job!
Sasquatch Farm – Phase I
South Pittsburg, Tennessee - 2021-02-02
Phase one at Sasquatch Farm RV and campground tossed us a variety of terrain. Awesome building between and over the rocks. 1.7 miles of hiking and biking trails open to the public if your camping here.
Beaver Lake – Phase III
Asheville, North Carolina - 2021-02-02
A 20 and a 25 foot bridge installed on the Beaver Lake trails. This now makes the loop mud free!
Bridgemore Village – Phase I
Thompson Station, Tennessee - 2021-02-02
Great hiking trails out the back door! With a large green space left that wasn’t developed, a trail system seemed appropriate. Phase one at Bridgemore Village complete. 1.75 miles, trail signage, 5 bridges and one large culvert installed.
Private Property – Phase I
Arden, North Carolina - 2021-02-02
1/4 mile jump track for a few rad young fellows! We had a blast working with these kids building their dream trail in their backyard. A wooden drop, log ride, berms and lots of jumps make this a wild ride!
Fonta Flora Trail – Phase II
Old Fort, North Carolina - 2021-01-02
1 more mile on the Fonta Flora state trail complete. Designed for bikes and hiking but leaning towards the bike side as this area of Western North Carolina is known for its great mountain biking opportunities. Berms, switchbacks and big views are bound to bring a great experience.
High Hampton Private Development – Phase II
Cashiers, North Carolina - 2021-01-02
4 bridges totaling 108 feet in length installed on phase one of the new High Hampton trail system. Using Black locust for the entire bridges assures 30 years of life.
Southern Wesleyan University – Phase IV
Central, South Carolina - 2021-01-02
1/4 mile flow track trail with ride options. Designed to prepare riders for what they might encounter out on the trails.
SC Dept of Natural Resources
Spartanburg/Union, South Carolina - 2021-01-01
Two trail systems totaling 8.5 miles of trail designed for the South Carolina Deptartment of Natural Resources. Both systems designed on a Heritage Preserve. One system was hiking while the other trail was designed for hiking and biking. These new trails will allow people in the Spartanburg and Union SC areas to explore these hidden gems!
Beaver Lake – Phase II
Asheville, North Carolina - 2020-12-01
Raised tread natural surface trail completed just in time for Christmas in Asheville NC on the popular Beaver Lake walking trail. Bridges and compacted gravel section coming early January. This technique of building we call “Puff Daddy”: It’s when you take a flat piece of land and barrow dirt from the sides of the tread to puff the trail up about 6” after compaction from the ground. This technique keeps water from standing on low lying trails.
High Hampton Private Development – Phase I
Cashiers, North Carolina - 2020-12-01
This is the first mile of 14 planned for the exclusive development in Cashiers call High Hampton. Starting on the lower land and we will be working our way to the top of the 2 mountains in conservation in 2021. Can’t wait to play more here!
Private Property
Granite Falls, North Carolina - 2020-12-01
1/4 mile hiking trail bringing owner to river. Maximizing the width of the property bouncing off each end of the property's boundary to get the proper grade for a sustainable trail. A few steps were needed. We used extra rail road ties that the owner had for the steps.
Couch Mountain Development – Phase I
Fletcher, North Carolina - 2020-10-01
First 2 of 5 miles hiking and biking trails in exclusive private development. Trail aligns under lots! Out your back door directly to the trail-what a dream!
Private Property – Phase II
Marshall, North Carolina - 2020-10-01
3/4 mile hiking trail down to the French Broad River. Rocks, big trees and steep grades....no problem!
Private Property – Phase II
Cedar Mountain, North Carolina - 2020-10-01
.3 more miles to make exactly one mile of flowing, bermed ebike trails.
High Hickory Private Neighborhood- Phase III
Swannanoa, North Carolina - 2020-09-01
Connector trail to gardens at High Hickory. Sometimes hand built trail is best!
Sasquatch Farm
South Pittsburg, Tennessee - 2020-09-01
4 mile design on private property for new RV & camping area. Unbelievable terrain to design on! Caves, waterfalls and tunnels await!
Southern Wesleyan University – Phase III
Westminster, South Carolina - 2020-08-01
Connector trail of 1000 feet at Southern Wesleyan University. This new trail connects the original trails around the new parking lot to create a continuous flow on these campus trails. Delivering a slab of broken sidewalk to use as a base for a bike stand.
Private Property – Clean Up
Lake Toxaway, North Carolina - 2020-07-01
Just under 3 miles trimmed on older trails we built years ago.
Private Property – Phase I
Sapphire, North Carolina - 2020-07-01
Phase one hiking/ biking trails on one of the most beautiful properties we have seen in some time! The forest floor was cleared and made the design spot on thru large boulders. The first mile is connecting family to their waterfall and rock overlook.  Next phases will get more in the backcountry!
Private Property – Phase I
Marshall, North Carolina - 2020-07-01
Had some great terrain to design 2 miles of hiking trail on private property. This trail is going to be awesome!
Beaver Lake – Crib Wall
Asheville, North Carolina - 2020-06-01
Crib wall using rock harvested from lake.
Jackson Park
Hendersonville, North Carolina - 2020-06-01
Rework on holes 4-10 on the Frisbee golf course. Main goal was to link users from the tee box to the next hole and make the “greenway,” off the tee box, more of a flat common trail until the point where users break off the main path.
Private Property
Brevard, North Carolina - 2020-06-01
1/2 mile kids flow MTB loop. Beginner trail to teach cornering, pumping over hills and gears on your bike. Kids and bikes are so cool!
Falling Creek Camp for Boys – Phase VIII
Tuxedo, North Carolina - 2020-05-01
Reworking trails for summer camp. After 11 years we finally saw areas that needed to be brought back to the level of the young campers.
Fonta Flora Trail – Phase I
Old Fort, North Carolina - 2020-05-01
2.3 miles hiking and biking trail near Old Fort N.C. Part of the Fonta-Flora trail. This trail was designed to lean more on the Mountain Bike side of things as that’s the biggest demand in this area. This trail also opens up opportunities for the community to have smaller loop options.
Private Property – Phase I
Cedar Mountain, North Carolina - 2020-05-01
3/4 mile E-BIKE course with lots of banked turns and jumps.
Beaver Lake – Phase I
Asheville, North Carolina - 2020-04-01
Public walking trail with 2,000 feet of hardened trail. Widened two ares where old trail was creeping into private property. Two crib walls using rock harvested from lake while drained.
Bee Tree Farms
Swannanoa, North Carolina - 2020-04-01
1.1 mile of RTV trail. 6 foot wide with a 30 foot locust based bridge.
Private Property – Clean Up
Clyde, North Carolina - 2020-04-01
This is a 1.5 mile clean up job on private property that we built trails for in the previous fall. Trimming winter deadfall, poison ivy and clearing the forest floor a bit more.
Private Property
Maggie Valley, North Carolina - 2020-03-01
Design & build 1/2 mile of walking trail on Private Property.
The Learning School of Asheville
Asheville, North Carolina - 2020-02-01
2.2 miles designed for kids to ride MTBs on.
High Hickory Private Neighborhood – Phase I
Swannanoa, North Carolina - 2020-01-02
Build of 3 miles in a private residential neighborhood.
Private Property – Phase II
Bristol, Tennessee - 2020-01-02
Continuation of work on 2 miles.
Private Property – Phase II
Cashiers, North Carolina - 2020-01-02
1.5 miles of new trail
Wildberry Lodge – Phase II
Leicester, - 2020-01-02
1/2 mile of new trail
Southern Wesleyan University – Phase II
Westminster, South Carolina - 2020-01-01
Design & build in central SC, 3 miles of trail for NICA events.
Hendrick Motor Sports
Concord, North Carolina - 2019-08-01
Designed and built 1 mile of ADA trail and natural surface trail.
Camp Green Cove
Tuxedo, North Carolina - 2019-06-01
2.2 miles
Private Property
Lake Toxaway, North Carolina - 2019-06-01
Designed and built 1.5 miles of trail
Private Property – Clean Up
Lake Toxaway, North Carolina - 2019-05-01
Spring maintenance on 5 miles of trails on private property.
Private Property
Canton, North Carolina - 2019-03-01
Designed and built 1 mile
Private Property – Phase I
Bristol, Tennessee - 2019-03-01
Designed and built 2.3 miles.
Private Property – Phase I
Cashiers, North Carolina - 2019-03-01
Designed and built 3 miles
Southern Wesleyan University – Phase I
Westminster, South Carolina - 2019-03-01
Designed and built 3.2 miles of trail.
Wildberry Lodge – Phase I
Leicester, North Carolina - 2019-02-01
Designed and built 3.5 mile
Charlotte Latin School – Phase II
Charlotte, North Carolina - 2019-01-02
1/2 mile connector.
Charlotte Latin School – Phase III
Charlotte, North Carolina - 2019-01-01
Cross Country running course, designed and built on a 1/4 mile reroute due to construction.
Private Property
Westminster, South Carolina - 2019-01-01
1.2 miles walking trails.
Design for 3 private properties
Brevard, North Carolina - 2018-10-10
Layout and design for trails on 3 private properties.
Private Property – Phase II
Pisgah Forest, North Carolina - 2018-06-12
1.5 mile walking trail
Private Property
Rosman, North Carolina - 2018-06-05
1/2 mile walking trail Rosman NC Owner wanted to see the top of the Ridge he owned. Dreams do come true!
Hitchcock Woods
Aiken, South Carolina - 2018-05-17
1 mile new trail at Hitchcock Woods. This place is heaven on earth for equestrians. Sand and clay make the best horse trails.
Private Property – Clean Up
Lake Toxaway, North Carolina - 2018-05-16
Clear trails for owner.
Skyland Camp for Girls – Phase III
Clyde, North Carolina - 2018-05-16
Clear trail system.
Charlotte Latin School – Phase I
Charlotte, North Carolina - 2018-04-04
Reworking old cross country loop. Added a 1/2 mile new trails on campus. Linking the campus via trails.
Anne Springs Close Greenway – Phase IV
Fort Mill, South Carolina - 2018-01-10
4 miles new mountain bike trail.
Camp Highlander
Mills River, North Carolina - 2018-01-10
Just over a mile of horse back / biking trails.
Forks Area Trail System (F.A.T.S.) – Phase IV
Augusta, Georgia - 2018-01-02
Rework completed. Making good trails better!
Silvermont Mansion – Phase IV
Brevard, North Carolina - 2017-10-11
Annual compaction of trail.
Forks Area Trail System (F.A.T.S.) – Phase III
Edgefield, South Carolina - 2017-09-13
Reworking a decade old classics! 10 years of traffic and weather has gotten the best of some areas. Deberming and opening up clogged drains on the south trails.
Anne Springs Close Greenway – Phase III
Fort Mill, South Carolina - 2017-09-07
2.5 miles new hiking trails and 2 miles of mountain bike trails.
Private Property in Lake Toxaway
Lake Toxaway, North Carolina - 2017-07-01
Clearing/cleaning off 5.8 miles of trails built in the last 5 years. Nature is too much for most private trail systems and eventually maintenance is required. In this case, 75% of this owners massive trail system was needing some love.
Falling Creek Camp for Boys – Phase VII
Tuxedo, North Carolina - 2017-06-01
Roots on flat trails at Falling Creek Camp had gotten too much for kids 6 and under to clear. By selectively cutting some roots out and ramping over others the 6 and under kids were back in action!
Pisgah Forest Private Property
Pisgah Forest, North Carolina - 2017-06-01
Created a 1 mile hiking trail around the home.
Silvermont Mansion Centennial Festival
Brevard, North Carolina - 2017-05-01
Clean-up of ADA Trail for Centennial Festival in May.
Skyland Camp for Girls – Phase II
Clyde, North Carolina - 2017-05-01
Building 1/2 mile new hiking/horse trails and cleaning up 1/2 mile trail for summer camp.
Wine Creek MTB Trail
McCormick, South Carolina - 2017-05-01
Rerouted trail that washed in creek. Created 1.6 miles of new trail.
Anne Springs Close Greenway – Phase II
Fort Mill, South Carolina - 2017-02-01

3.5 miles of new trail and 1.5 miles of reworking older trails. These hiking/biking/horse trails have added a more sustainable system for all users to enjoy safely. New areas to discover including a pond!

Latta Park
Charlotte, North Carolina - 2016-12-08

Layout and design of stairs to replace social trails formed over the years. These pictures show WHERE people want to go. Now they will have an easier trail to access the park!

Anne Springs Close Greenway – Phase I
Fort Mill, South Carolina - 2016-10-11

Master Trail Plan- layout of 12 miles of new trail

Silvermont Mansion – Phase III
Brevard, North Carolina - 2016-09-15

Water control features added to Silvermont Trails. Designed two water management areas to stop sheeting water from a new playground and tennis courts. This keeps the trail safe from flash floods.

Allison Deavor House
Pisgah Forest, North Carolina - 2016-09-08

1/2 mile design and build of new trail at Transylvania County's first home. A mix of mulched tread and natural surface trail.

Skyland Camp for Girls – Phase I
Clyde, North Carolina - 2016-06-16

1/2 mile design and build. Trail was designed for horses along a stream.

Private Property
Hendersonville, North Carolina - 2016-04-06

1 mile design and build new hiking trail including an outdoor yoga platform. The one mile trail looped the house!

Pilot Cove Campground
Pisgah Forest, North Carolina - 2016-01-07

Design 1 mile of flow track with wooden berm

Camp Mondamin
Tuxedo, North Carolina - 2015-12-16

7 mile master plan for Camp Mondamin, build 3.5 miles of new trail.

Private Property – Phase V
Lake Toxaway, North Carolina - 2015-09-16

3 miles new trail on Private property for hiking and mountain biking. Blue Trail - Hard trail to build due to the many bridges, rocks and steep terrain.

Lake James State Park
Marion, North Carolina - 2015-09-09

3/4 miles of new hiking trail came with a rare flip!  Custom drive pin was made to get through last 500 feet of trail before we could make the proper repair.

Silvermont Mansion – Phase II
Brevard, North Carolina - 2015-07-17

ADA trail extended to new ADA comparable playground.

Falling Creek Camp for Boys – Phase VI
Tuxedo, North Carolina - 2015-03-12

1/2 mile new trail in 2015, 2 miles new trail in old apple orchard in 2016.

Private Property
Hendersonville, North Carolina - 2014-07-15
This was a design and build of 1 mile of jumps and pumps! These kids will only want more progression down the road. Flow trails are the new pump tracks it seems.
Uwharrie National Forest – Phase II
Troy, North Carolina - 2014-02-15
Maintenance and rework of 0.6 mile on Josh Trail horse/hiking/biking trail.
Silvermont Mansion – Phase I
Brevard, North Carolina - 2014-01-14
Layout & design of 1/2 mile ADA trail.
Uwharrie National Forest – Phase I
Troy, North Carolina - 2013-12-19
Private Property – Phase IV
Transylvania County, North Carolina - 2013-10-10

3 miles new trail - Black Trail - Hand built 0.6 mile of trail on top of rock bald allowing for 365 degree view.

Private Property – Phase III
Transylvania County, North Carolina - 2013-08-22
Red Trail - Construction of 1.84 miles of trail, 1.3 miles of which was a hand built trail with 400 rock or locust steps leading up to a rock bald. Also includes installation of 100' suspension bridge traversing the rock face and lots of rock armoring.
Private Property – Phase II
Transylvania County, North Carolina - 2013-06-01
Yellow Trail - Construction of 1.12 miles of ATV friendly trail with several boardwalks and bridges.
Gateway Properties
Old Fort, North Carolina - 2013-05-16
Layout & Design of trail system in residential neighborhood.
Dupont State Forest – Phase III
Cedar Mountain, North Carolina - 2013-03-22
Construction of Turkey Knob Extension and Grassy Meadow Reroute.
Private Property – Phase I
Transylvania County, North Carolina - 2013-03-01
Orange & Purple Trails - 2.14 miles of machine built Mountain Bike & Hiking trail with several bridge installations.
Falling Creek Camp for Boys – Phase V
Zirconia, North Carolina - 2013-02-15
Layout, Design and Construction of 2.4 miles of trail.
Payne’s Creek – Phase II
Hartwell, Georgia - 2013-02-14
Construction of 2 additional miles of trail.
Dupont State Forest – Phase II
Cedar Mountain, North Carolina - 2013-01-10
Construction of High Falls Extension and Triple Falls Shortcut Trails. Consisted of ADA compliant raised limestone tread.
Falling Creek Camp for Boys – Phase IV
Zirconia, North Carolina - 2012-12-13
Layout, Design and Construction of 1/2 mile of raised tread surface contouring the lake at the center of camp. Raised tread surface with large rock boulder anchoring the trail to the hillside above, creating some rock benches overlooking the lake.
Sope Creek Trails
Sandy Springs, Georgia - 2012-11-01
1.5 mile design and reroute on the popular Sope Creek trails near downtown Atlanta. Mountain Bike trails and Hiking trails in a heavily populated area on National Park land.
Quellin Subdivision
Waxhaw, North Carolina - 2012-10-18
Layout and design of 1.5 miles of neighborhood trails connecting to school.
Lake James State Park
Lake James, North Carolina - 2012-06-14
Construction of 2 miles of beginner mountain bike trail.
Bracken Mountain Preserve – Phase II
Brevard, North Carolina - 2012-03-01
Construction of 8 miles of trail, creating two small inner loops and a connector trail to Pisgah National Forest. This has provided the city with a great, accessible trail for the town as well as allowed people to connect with the Fish Hatchery in the national forest. Working with community volunteers to corridor clear and finish the trail allowed the city to save on funding and also allowed residents to own a part of the unique trail system.
At the Ridge
Balsam Grove, North Carolina - 2012-02-09
Layout and design ONLY. Master Plan consisting of 2.5 miles of cross country style trail (to include wooden features such as corkscrews, teeter-totters, jump ramps and berms), skills course, expert and intermediate downhill course, dual slalom course, pump track and an expert and intermediate downhill jump course. Construction was not done by LCT.
Sumter National Forest
Union, South Carolina - 2012-01-12
Layout and design of 38 miles of trail.
Camp Merri-Mac
Black Mountain, North Carolina - 2011-12-09
Layout, design and construction of 2.25 miles of beginner mountain bike and hiking trail.
Camp Arrowhead
Tuxedo, North Carolina - 2011-11-10
Layout, design and construction of 1/2 mile of trail.
Falling Creek Camp for Boys – Phase III
Zirconia, North Carolina - 2011-10-06
Layout and construction of 2 more miles of intermediate mountain bike trail.
Bracken Mountain Preserve – Phase I
Brevard, North Carolina - 2011-08-03
We worked with the City of Brevard to help layout 8 miles of trail that will connect downtown with Pisgah National Forest.
Buncombe Horse Trail
Clinton, South Carolina - 2011-07-07
Construction of 3600' of equine trail.
Private Property
Charlotte, North Carolina - 2011-05-12
Layout, Design and Construction of 1 mile of trail in residential garden setting.
Osa Mountain Village
Costa Rica, - 2011-05-11
Layout and Design of 5 miles of trail in dense jungle in southern region of Costa Rica.
Dupont State Forest – Phase I
Cedar Mountain, North Carolina - 2011-02-09
Construction of 4 miles of trail. Rework of Micajah, Pitch Pine and Pine Tree trails. New construction of Cascade and Three Lakes Trails.
Payne’s Creek – Phase I
Hartwell, Georgia - 2010-12-09
Hybrid Project. Assisted U.S. Army Corps of Engineers in layout and design. Full machine construction of 7 miles of trail. Local SORBA chapter aided in preparation and finishing of trail.
Asheville-Buncombe Technical Community College
Asheville, North Carolina - 2010-11-03
Layout of 1 mile of trail on Enka-Candler campus.
Morgan Falls
Sandy Springs, Georgia - 2010-06-17
Layout, Design and Construction of 1 mile of trail.
Falling Creek Camp for Boys – Phase II
Zirconia, North Carolina - 2010-03-02
Layout, Design and Construction of 3 miles of beginner mountain bike trail.
Chimney Rock State Park
Chimney Rock, North Carolina - 2010-02-18
350 feet of reinforced steps on top of Chimney Rock State Park. The old paved section of trail to Inspiration point lookout buckled due to wet conditions and  freeze/thaw. Steps with gravel surface will last the times on this hiking trail.
Aska Trail System
Blue Ridge, Georgia - 2010-01-14
The Aska Trails Area is a 17-mile hiking-mountain biking trail system in the National Forest near Deep Gap on Aska Road in Blue Ridge, GA. Trails range from 1 to 5.5 miles and vary in difficulty. The system utilizes hand dug tread way and old logging roads. Trails climb to 3,200 feet with views of mountain ridges and descend to the shores of Lake Blue Ridge. A hiker can expect to hike through forested areas with mature hardwoods and thickets of mountain laurel and rhododendron. During the early months of 2010, we laid and designed trail.
Falling Creek Camp for Boys – Phase I
Zirconia, North Carolina - 2009-05-01
Layout, Design and Construction of 1 mile of trail connecting to existing trail. Beginner to intermediate rated mountain bike trail.
El Zur
Antigua, Guatemala, - 2009-04-16
Layout and Design of 8 miles of trail. Construction of 3 miles of trail.
Ashmore Heritage Preserve
Cleveland, South Carolina - 2008-09-17
Construction of 3 miles of new tread.
Allegrippis Trail System
Raystown Lake, Pennsylvania - 2008-05-15
Construction of 5 miles of trail.
Private Property
Canton, Georgia - 2008-01-02
3 miles of Mountain Bike flow trails for private owner in the North Georgia Mountains.
Sope Creek
Atlanta, Georgia - 2007-12-20
Layout and Design of 6 miles of trail. Constructed 3 miles of laid out trail.
Keowee-Toxaway State Natural Area
Sunset, South Carolina - 2007-12-13
One half mile of new construction on beginning of Natural Bridge Trail. Reconstruction of existing trail installing a huge 6x6 staircase leading into rock steps.
Musgrove Mill State Historic Site
Clinton, South Carolina - 2007-10-18
New construction of three miles of trail with several 8x8 and 10x10 step sections and two cool bridges.
Crowders Mountain State Park
Gastonia, North Carolina - 2007-09-12
Caesars Head State Park
Cleveland, South Carolina - 2007-08-16
Reconstruction of existing Naturaland Trust Trail. Installation of locust staircase, raised rock causeway, and locust cribbing.
Hamilton Creek State Park
Nashville, Tennessee - 2007-04-12
Redesign of existing trail system including plans for new skills course and downhill loop with large drops.
Post Canyon
Hood River, Oregon - 2007-04-11
Construction reroute of 1 mile of trail. Safely directed riders and hikers to the parking lot instead of shooting them down the fall line like the previous trail did.
Forks Area Trail System (F.A.T.S.) – Phase II
Edgefield, South Carolina - 2007-02-17
Additional 12 miles built consisting of two northern trails- Big Rock (4 m) and Tower (3.8 m). Nestled in the Long Cane Ranger District of the Sumter National Forest, FATS is the crown jewel of the CSRA trails, and for good reason. FATS has something for everyone. Very few technical features make FATS a great place to get beginners hooked on the sport, and the excellent flow, pump track like feel, and high speed sections combined with lots of mileage keeps bringing the seasoned riders back for more time and time again.
Alexander Mountain Bike Park
Asheville, North Carolina - 2006-12-22
Construction of 4 miles of new trail with rolling hills allowing for plenty of jumps and short, grunt uphill sections. Lots of narrow hand-benched singletrack. Built on land bordering the Buncombe County Landfill, Long Cane Trails did an excellent job of hiding that fact and accenting the trail with beautiful overlooks of the French Broad River. This was run as a hybrid project in that volunteers were responsible for doing a lot of the pre and post machine work.
Forks Area Trail System (F.A.T.S.) – Phase I
Edgefield, South Carolina - 2005-09-15
25 Miles of trails with swooping turns and rolling hills through hardwood and pine forest of Sumter National Forest. Accessibility for the beginner to the technically advanced. Plenty of speed and jumps around every corner for those seeking a thrill. Consisting of four southern loops- Great Wall (7.5 m), Skinny Loop (6 m), Brown Wave (5.8 m) and Deep Step (5 m). Nestled in the Long Cane Ranger District of the Sumter National Forest, FATS is the crown jewel of the CSRA trails, and for good reason. FATS has something for everyone. Very few technical features make FATS a great place to get beginners hooked on the sport, and the excellent flow, pump track like feel, and high speed sections combined with lots of mileage keeps bringing the seasoned riders back for more time and time again.
Anne Springs Close Greenway
Fort Mill, South Carolina - 2004-09-18
Just outside metropolitan Charlotte, NC sits the Anne Springs Close Greenway, a 25 mile trail system with separate trails for biking, equestrian and hiking. Long Cane Trails redesigned the entire mountain bike section and constructed three miles of re-routes.
Overmountain Victory National Historic Trail
Gaffney, South Carolina - 2004-08-12
Along the shores of Lake Whelchel and Cherokee Creek in Gaffney, LCT constructed the first purpose built section of the Overmountain Trail. The 3 mile section contains extensive rock and cedar cribbing as well as full bench construction on steep side slope.
Sumter National Forest
Edgefield, McCormick and Greenwood County, South Carolina - 2004-06-17
LCT has taken on three different projects of various scopes in the Long Cane District of Sumter National Forest. The Wine Creek Trail Project was to rebuild or repair fourteen bridges on a five mile mountain biking/hiking trail in McCormick County. Railings were repositioned to allow bikers easier access. The Long Cane Horse Trail has had 10+ miles redesigned and reconstructed by Long Cane Trails. The Horn Creek Trail also had a redesign by LCT.
Hickory Knob State Park
McCormick, South Carolina - 2004-03-11
Hickory Knob State Park is where LCT truly cut its teeth. Here, LCT worked with Tony Boone of Arrowhead Trails to design a trail system within the park. The trail consisted of various sections targeting different ability levels of off road cycling. The Lakeview Loop was a seven mile trail, consisting of 6 mile of trail for serious riders near the lake and another mile of easy trail, built entirely by hand over a six month span. This trail winds its way onto a dozen fingers stretching out into Lake Thurmond. The next two trails built at Hickory Knob State Park were built using the Toro Dingo. The Beaver Run Trail built was an easy 2.5 mile path that connects the lodge to the pro shops and skeet range. The Turkey Ridge Loop is accessible from the Lakeview Loop, and although it is only 1.8 miles long it offers the longest climb in the area.
Baker Creek State Park
McCormick, South Carolina - 2002-05-01
Baker Creek State Park was the first construction project undertaken by LCT. Here we took the principles learned from Tony Boone of Arrowhead Trails to re-design and then build close to three miles of trail within an existing trail system. Our primary goals were to remove unsustainable sections and to improve the flow of this popular mountain bike trail. Through word of mouth and reading reviews of this trail on mtbr.com, it was a success. LCT secured $20,000 in Recreational Trail Grant funds to Baker Creek in 2002-2003.